Fiedler Brothers Plumbing even though may be classified as a fledgling business operating since 1st April 2012, it is directed and managed by very experienced individuals. Since the purchase of the business the following projects/works have been undertaken and completed with immense success:-

Kingaroy Developments

Duration:  5 Months

Description

Subdivision civil works –
including

  • installation of hydrants,
  • water meters,
  • valves,
  • installation of water services to individual blocks of land,
  • main waterlines,
  • road cross overs
  • installation of main sewer line

Paynter Dixon

Duration:  6 Months

Description

Plumbing and Drainage to New buildings at Kingaroy Hospital including:

  • Water lines
  • Pits and valves
  • Hydrants
  • Installation and commissioning of fixtures including
    chiller fountain, hot water systems, pumps, tanks
  • Stormwater
  • Downpipes

McConaghy Retail

Duration: 2 Years

Description

Maintenance and repairs including:

  • General repairs of pipework and fixtures and fittings
  • TMV Valve Testing

Domestic Customers

Duration: Continual

Description

Repairs and Installations including:

  • Installation of hot water systems including solar,
  • Repairs to fixtures and fittings,
  • Treatment plant installations, commissioning and servicing
  • Plumbing associated to renovations
  • Roof & gutter repairs
  • Downpipe installation and repairs
  • Roof Replacements

Business Customers

Duration: Continual

Description

Repairs and installations including:

  • All as domestic
  • TMV Valve servicing and testing

Real Estates (Various)

Duration: Continual

Description

Repairs and installations including:

  • All works as per Domestic Customers

Hutchinson Builders

Duration: 6 Months

Description

Plumbing and Drainage to New buildings at Kingaroy State High School including:

  • Water lines
  • Pits and valves
  • Hydrants
  • Installation and commissioning of fixtures including chiller fountain, hot water systems, pumps, tanks
  • Stormwater, Downpipes

Hutchinson Builders

Duration: 3 Months

Description

Sewer Diversion and civil stormwater at Kingaroy Ambulance Station

 

Hutchinson Builders

Duration: 6 Months

Description

Plumbing and Drainage to New buildings at Kingaroy State High School including:

  • Water lines
  • Pits and valves
  • Hydrants
  • Installation and commissioning of fixtures including chiller fountain, hot water systems, pumps, tanks
  • Stormwater, Downpipes

During each of the above projects/works undertaken, Fiedler Brothers Plumbing has functioned as an integral part in the planning and completion of the works. From liaising with Engineers and Project Managers/ and Customers to enable the completion of all works in a timely manner and to meet all standards and criteria required.

Fiedler Brothers Plumbing also go beyond the initial requirements set out in project works by finding alternative methods in producing the outcome required, if the original requirements do not or will not meet the required outcome to the standard or time desired by the Client.